Our job is to make
your work look great
Rock Spring is proud of the partnerships and more importantly the relationships we've developed through the years.
Featured Projects
Our Work
Location
VA
Booz Allen Hamilton Executive Suite
GC
HITT Contracting
Architect
OTJ Architects
Size (sqft)
20000
Scope
Demolition
Description
Rock Spring completed the full floor interior demolition in a 2 week schedule, requiring a night shift. Demolition included a complete gut of dense office build out and all trash removal services.
Location
DC
Capital One Arena Seats
GC
Clark Construction
Architect
Studios Architect
Size (sqft)
Scope
Demolition
Description
This unique project required the removal of 36 sections of bleachers inside Capital One Arena. The project required heavy equipment to transport, dismantle and recycle the seats and was completed while working around Arena events.
Location
Richmond
Carmax HQ
GC
LF Jennings, KBS
Architect
HOK
Size (sqft)
60000
Scope
Raised Access Floors
Description
Furnish and installation of 60K SF of Tate Raised Access floors and custom built stairs and ramps; project delivered ahead of schedule.
Location
VA
CloudHQ Data Center LC
GC
Holder Construction
Architect
Corgan Architects
Size (sqft)
562000
Scope
Mission Critical, Interiors
Description
Rock Spring completed the drywall, ACT, and structural ceiling scope associated with this 562,000 SF core & shell project. In addition, the scope of work included delivering the first four data halls which involved a substantial amount of design built bridging and bracing in the structural ceiling to accommodate the MEP systems.
Location
VA
Coresite VA3
GC
Whiting Turner
Architect
Corgan Architects
Size (sqft)
45000
Scope
Raised Access Floors
Description
Rock Spring partnered with Whiting Turner to retrofit this existing Data Hall consisting of 43,000 SF of new Tate Raised Access Floors. This project consisted of the removal of existing flooring, ramps and railings and going back with new Tate Concore HPL panels and perforated panels set on a 36' high Bolted Stringer understructure. Rock Spring also provided mock ups, BIM Modeling and all necessary shop drawings.
Location
VA
CSRA
GC
Bognet Construction
Architect
Form Architects
Size (sqft)
75000
Scope
Demolition
Description
This specialized demolition included gutting two full floors of interior office space, rooftop work and exterior ground-level cooling tower and precast concrete removal.
Location
MD
Calvert Memorial Hospital
GC
HITT Contracting
Architect
Wilmot Sanz
Size (sqft)
70000
Scope
Interiors
Description
This hospital renovation scope included building out patient rooms, installing exterior mechanical shaft and screen walls, and building ICRA walls.
Location
VA
Capital One HQ
GC
HITT Contracting
Architect
Interior Architects
Size (sqft)
65000
Scope
Demolition, Interiors
Description
At Capital One's headquarters in McLean, Rock Spring gutted this 65,000 square foot space ahead of schedule and was brought on board to perform the build-out as well. The build-out included Rulon specialty ceilings, Axiom ceilings, and engineered people nooks.
Location
DC
Chemonics
GC
Davis Construction
Architect
Gensler
Size (sqft)
300000
Scope
Demountables, Interiors
Description
Rock Spring completed a 12 floor build out of a brand new headquarters for Chemonics with multiple specialty ceilings and demountable walls throughout
Location
VA
CloudHQ Data Center MCC
GC
Holder Construction
Architect
DVA
Size (sqft)
30000
Scope
Demolition, Mission Critical, Interiors
Description
This was a mission critical project that was restricted to US Citizens and required extensive security requirements. Rock Spring completed the ceiling systems in 4 accredited computer rooms along with an accredited office area consisting of mesh partitions, radiant foil, and bullet resistant partitions.
Location
VA
Crystal Drive
GC
Clark Construction
Architect
Gensler
Size (sqft)
250000
Scope
Demolition
Description
A complete gut of 14 floors in downtown Crystal City was completed in a condensed 12 week schedule. Demo scope was a full interior-gut including SCIF walls, stone removal, concrete cutting, and a 12-story trash chute. Rock Spring also provided the LEED hauling services so that the project could meet the daily hauling requirements necessary to accelerate the schedule.
Location
VA
Cyrus One NVA Data Centers
GC
HITT Contracting
Architect
Corgan Architects
Size (sqft)
40000
Scope
Mission Critical, Interiors
Description
Rock Spring partnered with HITT to fit out two data halls that included a substantial ceiling system consisting of Tate structural grid, an engineered strut support system, and custom sized ACT tiles. At almost 75% ceiling completion a design change prompted a full ceiling deconstruction/modifications and reinstall.